RideOnTrack received the final acceptance certification from Edelaraudtee Infrastruktuuri AS

The dispatcher system delivered by RideOnTrack for the Edelaraudtee Infrastruktuuri AS operational communication network reached the final acceptance certification. The system is now in full operation and the old APC-11N (Russian brand) has been switched off. The dispatcher network is distributed over the different train stations along the 224km railway line. Edelaraudtee Infrastruktuuri AS is operating and interconnected via a MPLS L3VPN (Cisco). The co-operation between RideOnTrack and Edeleraudtee Infrastruktuuri AS went very smooth and only 4 months passed between the first customer contact and reaching this final acceptance certificate. PleaseĀ find more information about this project under references, customer testimonial.